Sample Road from University Drive to Belmonte Boulevard

  • Project typeFDOT
  • Project value$8,489,802
  • Project scheduleOctober 2024 - Summer 2025

 

sample.png

The Resurfacing, Restoration and Rehabilitation (RRR) projects will extend the service life of the pavement, enhance roadway safety, and improve operating characteristics of the corridor. 

PROJECT DETAILS

Project improvements include milling and resurfacing the existing roadway within the project limits to ensure long-term resilience; upgrading sidewalks, curb ramps, pavement markings, and signage to improve visibility and accessibility; upgrading existing pedestrian signals at the intersections of SR 834/West Sample Road at Holiday Springs Boulevard and 1800 Block (Costco entrance) to improve pushbutton accessibility and pedestrian safety; and upgrading existing streetlight poles to LED fixtures throughout the project corridor to enhance nighttime visibility and pedestrian safety.

TRAFFIC IMPACTS 

  • SR 834/West Sample Road from SR 817/University Drive to Belmonte Boulevard will have one lane closed in each direction daily, as needed, 9 a.m. until 3 p.m., and nightly, as needed, 9 p.m. until 7 a.m., weekdays and weekends.
  • SR 834/West Sample Road from SR 845/Powerline Road to Military Trail will have one lane closed in each direction daily, as needed, 9 a.m. until 3 p.m., and nightly, as needed, 9 p.m. until 7 a.m., weekdays and weekends.