Fee Schedule and User Fees

(A) Expired Permit Fees    
(1) Renewal-expired permits - All disciplines:    
      a. Fifty percent (50%) of original master permit fee, minimum… 128.80  
       
(B) Miscellaneous Fees    
(1) All construction include educational and technology fees for the benefit of the Building Department (per thousand of estimated cost) 0.61  
(2) Certificate of occupancy:    
      a. Standard - No Charge N/C  
      b. Temporary, per residential units, per unit per 30 days 93.08  
      c. Temporary, partial or stocking for commercial and other non-residential buildings: 296.29  
(3) Permit card replacement- all disciplines 24.81  
(4) Temporary Use Permit 93.08  
(5) Building Safety Inspection, per building 370.02  
(6) Vacation Rental Building Inspection Fee 75.00  
(7) Business Tax Building Inspection Fee (Fee is for change of use only, no fee if no change in use) 150.00  
(8) Technology Fee, converting paper files to electronic submittals, per permit* 20.00  
      a. Documents larger than 11” x 17” per sheet 2.00  
(9) Record Requests - Photocopy Duplication    
      a. Paper - Standard Size (no charge if under $2.00):    
         1. One-sided copy 8.5"x11" or 8.5"x14", per copy 0.15  
         2. Two-sided copy 8.5"x11" or 8.5"x14", per copy 0.20  
      b. Blueprints, Zoning Maps, Plats:    
         1. 24"x36" BW, per page 1.25  
         2. 36"x36" BW, per page 2.25  
         3. 24"x36" Color, per page 5.00  
         4. 36"x36" Color, per page 7.50  
         5. 42"x42" Color, per page 10.25  
         6. Future Land Use Map, per page 3.25  
      c. Scanning:    
         1. 8.5"x11" (includes e-mail), per sheet 1.00  
         2. 24"x36" (includes e-mail), per sheet 2.00  
      d. Duplication - Electronic Records:    
         1. CD, per CD 1.25  
         2. DVD, per DVD 2.25  

       3. Flash Drive, per Flash Drive 5.00  
       
(C ) Building Permit Fees  
(1) New Construction - Residential and Commercial    
      a. New Construction - Structural - % of total construction value 0.79%  
      b. New Construction - Electrical - % of total construction value 0.34%  
      c. New Construction - Plumbing - % of total construction value 0.10%  
      d. New Construction - Mechanical - % of total construction value 0.12%  
(2) Construction including Residential and Commercial Alterations and Additions:    
      a. Structural - Percent of total construction value 1.96%  
      b. Electrical - Percent of total construction value 0.85%  
      c. Plumbing - Percent of total construction value 1.18%  
      d. Mechanical - Percent of total construction value 0.63%  
(3) Reinspection - All disciplines (each reinspection) 85.11  
(4) Lost plans review (replacement of on-site plans: sfr, multi, commercial, covers all disciplines) 99.29  
(5)  Plan resubmittal fee (for 3rd and subsequent resubmittals) 68.24  
(6) Open permit request - per request 49.64  
(7) Change in contractor and/or subcontractor - all disciplines 49.64  
(8) Contractor overtime request-plan review per hr, minimum 113.34  
(9) Expedited plan review, per hour, per trade (one hour minimum) 113.34  
(10) Administrative Fee for Engineering Permits 24.81  
(11) Early Start Approval 62.05  
(12) Private Provider Discount - Plan Review and Inspection 30%  
      a. Private Provider Discount - Inspection Only 15%  
(D) Structural Permit Fees    
(1) Administrative fees 109.22  
(2) Awning (each): Base fee 148.95
                           plus per awning 49.64  
(3) Deck (wood) 279.32  
(4) Demolition 155.15  
(5) Fence - base fee 109.22  
               plus, per lineal foot 0.34  
(6) Landscape affidavit 80.66  
(7) Garage door 173.78  
(8) Gutters 173.78  
(9) House moving filing fee within the City of Coral Springs 372.44  
(10) Hurricane Shutters ( sfr, duplex, triplex - each multifamily, commercial, per floor):    
      a.  1-3 shutters 148.95  
      b.  Each additional shutter 12.37  
(11) Masonry wall - base fee 173.78  
                           plus, per lineal foot 0.89  
(12) Minimum fee (one inspection) 109.22  
(13) Plan review (per 1/4 hour, minimum 1/2 hour) 31.02  
(14) Pool/spa/hot tub 248.28  
(15) Roofs/re-roofs:    
      a. Flat re-roof: 217.23
         1. First 50 squares 217.23  
         2. Each additional 50 squares 93.08  
      b. Re-roof slope 248.28  
      c. Roof repair (2 squares and under) 93.08  
      d. Roof slope and flat 465.54  
(16) Satellite dish ( over 18" requires separate electric permit) 148.95  
(17) Screen enclosure - pool 229.66  
(18) Signs (unlighted, permanent or temporary) 155.15  
(19) Slab ( porch, patio, monolithic)  148.95  
(20) Tent ( any size, each) 93.08  
(21) Trailer (construction, storage, each) 248.28  
(22) Window/door replacement 93.08  
  plus  $12.37 per unit 12.37  
(23) Kitchen Cabinet replacement only, no structural work required   0  
       
 (E ) Electrical Permit Fees  
(1) A/C change out 136.52  
(2) Meter can 93.08  
(3) Burglar alarm, new and retrofit (per floor up to 6 units) 55.00  
  with each additional unit at a cost of $8.55 each 8.55  
(4)  Commercial site lighting:    
      a.  1-3 light standards 93.08  
      b.  Each additional light standard 22.31  
(5) Computer systems (commercial, per floor) 173.78  
  Computer systems pre-wire (per floor) 93.08  
(6) Electric sign (each) 155.15  
(7) Electronic water meters, per unit 12.37  
(8) Energy management system 93.08  
(9) Fire alarm ( sfr, duplex, triplex - each multifamily, commercial, per floor) 217.23  
(10) Heat pump 142.75  
(11) Low voltage- individual systems per system (minimum fees):    
  a. 1. Sprinkler time clock, new installations only : 1-3 time clocks 109.22  
       2. each additional time clock 12.37  
(12) Minimum fee (one inspection) 109.22  
(13) Pool/spa/hot tub/fountain 248.28  
(14) Pool alarm system 142.75  
(15) Radon mitigation (per unit) 142.75  
(16) Satellite dish ( requires separate structural permit)  155.15  
(17)     a. Service Change:  Residential 124.13  
      b. Service Change:  Commercial 155.15  
(18) Sprinkler Pump, heat pump 148.95  
(19) Temporary electric 124.13  
    30-day temporary electric 62.05  
(20) Trailer (construction, sales, etc…) 155.15  
(21) Demolition 155.15  
(22) Plan review (per ¼ hour, minimum ½ hour) 31.02  
       
(F) Plumbing Permit Fees  
(1) Backflow preventer (new installation only), min. fee 124.13  
(2) Electronic water meters, per unit 12.37  
(3) Fire sprinkler system 310.34  
(4) Gas pool heater 93.08  
(5) LP Gas system ( 1 tank, 1 meter, 2 outlets)  93.08  
(6) LP Gas tank(s) 93.08  
(7) Minimum fee (one inspection) 105.50  
(8) Plan review (per 1/4 hour, minimum 1/2 hour) 31.02  
(9) Sewer hook-up 93.08  
(10) Site work, drainage, water mains, fire, sewer mains - % of contract price  2.05%  
(11) Solar pool heater/water heater 124.13  
(12) Water heater (domestic water) 93.08  
(13) Water well 2" - 4 1/2 " 93.08  
(14) Demolition 155.15  
(15) Irrigation System 186.20  
       
(G) Mechanical Permit Fees  
(1) A/C change out 136.52  
(2) Gas, pool heater 93.08  
(3) LP Gas system (1 tank, 1 meter, 2 outlets) 93.08  
(4) LP Gas tank(s) 93.08  
(5) Minimum permit (one inspection) 105.50  
(6) Plan review (per 1/4 hour, minimum 1/2 hour) 31.02  
(7) Radon mitigation  93.08  
(8) Demolition 155.15  
       
  Zoning:    
(1) Zoning Compliance Letter 179.04  
(2) Re-inspection:
 
      a.  Single-Family/Duplex 73.39  
      b.  Multi-Family 218.97  
      c.  Non-Residential 218.97  
(3) Sign review for installation or alteration 104.31  
(4) Expedited plan review, per hour (one hour minimum) 113.34  
  Fire:    
(6) Plan Review:    
      a. 2,500 sq. ft. and under 246.04  
      b. More than 2,500 sq. ft. Plus, per sq. ft. $.06 246.04  
      c. Single station smoke detector, per residential unit 75.98  
      d. Major plan revision, per hour 126.23  
      e. Minor plan revisions (correction, lost plans-Review not to exceed 15 minutes) 30.89  
      f. Expedited plan review, per hour ( one-hour minimum) 114.63  
(8) Re-inspection Fee 235.72  
  Engineering Administrative and User Fees:    
(1) Land clearing permit 246.04  
(2) Renewal of land clearing permit 73.39  
(3) Excavation permit 246.04  
(4) Renewal of excavation permit 73.39  
(5) Land filling permit 225.42  
(6) Renewal of land filling permit 73.39  
(7) Permit for installation and connection of sewers:    
      a. Residential 48.92  
      b. Commercial 79.84  
      c. Industrial 162.30  
(8) Improvements within public rights-of-way
 

    a. Per lance cut for pavement excavation 252.48  
      b. Per each 100 linear feet of off-pavement excavation 97.89  
      c. Driveway permit 162.30  
      d. Lost plans - Driveways only 97.89  
      e .All other improvements not specified above 101.75  
(9) Excavation in right-of-way    
  (other than driveway approach or apron), cash bond of 3115.15  
(10) Publicly dedicated easements:    
      a. Dedication 514.02  
      b. Vacation 514.02  
(11) Engineering fee for on-site water and sewer connections: 2% of construction costs (minimum of $486.95) 2%  
(12) Change of contractor 48.92  
(13) Overtime request - Inspections, per hour 225.42  
(14) Overtime request - Plan review, per hour 225.42  
(15) Expedited plan review, per hour (one hour minimum) 225.42  
(16) Lost plan reviews (replacement of on-site plans) 225.42  
(17) MS4/NPDES, per inspection (not to exceed $250.00) 69.53  
(18) Plan revision fee 225.42  
(19) Re-inspection fee 149.42  
(20) Work without a permit Double permit fee  
  Sec. 5-2. - Building Permit Submittal Fee Deposit  
  Deposit required with building permit application.
A deposit of one hundred dollars ($100.00) per single-family residential unit and two hundred dollars ($200.00) for all other building permits shall be required to be paid at the time application for building permits is made. Each deposit so made shall be nonrefundable with the monies being retained by the City of Coral Springs in the event a building permit is not issued to offset the administrative costs incurred in processing said application. If, however, a building permit is issued pursuant to said application then the monies so deposited shall be credited to the building permit cost at the time of issuance. Applications made for building permits shall be held by the city for a period of sixty (60) calendar days and if, at the expiration of this time period, a building permit has not been issued pursuant to said application then said application shall be voided by the city and the deposit monies credited to administrative expense.
  (Ord. No. 74-132, § 1, 6-18-74; Ord. No. 94-100, § 2, 2-15-94)
  Commercial Applications:
Tenant Improvements, Additions, Alterations Value over $25,000 - $200.00 Submittal Fee
  Residential Applications:
Alterations or Additions Value over 12,500 - $100.00 Submittal Fee