Fee Schedule and User Fees

(A) Expired Permit Fees    
(1) Renewal-expired permits - All disciplines:    
      a. Fifty percent (50%) of original master permit fee, minimum… 125.27  
       
(B) Miscellaneous Fees    
(1) All construction include educational and technology fees for the benefit of the Building Department (per thousand of estimated cost) 0.61  
(2) Certificate of occupancy:    
      a. Standard - No Charge N/C  
      b. Temporary, per residential units, per unit per 30 days 90.53  
      c. Temporary, partial or stocking for commercial and other non-residential buildings: 288.16  
(3) Permit card replacement- all disciplines 24.13  
(4) Temporary Use Permit 90.53  
(5) Building Safety Inspection, per building 359.87  
(6) Vacation Rental Building Inspection Fee 75.00  
(7) Business Tax Building Inspection Fee (Fee is for change of use only, no fee if no change in use) 150.00  
(8) Technology Fee, converting paper files to electronic submittals, per permit* 20.00  
      a. Documents larger than 11” x 17” per sheet 2.00  
      *No charge for residential A/C & Water Heater replacement permits. N/C  
(9) Record Requests - Photocopy Duplication    
      a. Paper - Standard Size (no charge if under $2.00):    
         1. One-sided copy 8.5"x11" or 8.5"x14", per copy 0.15  
         2. Two-sided copy 8.5"x11" or 8.5"x14", per copy 0.20  
      b. Blueprints, Zoning Maps, Plats:    
         1. 24"x36" BW, per page 1.25  
         2. 36"x36" BW, per page 2.25  
         3. 24"x36" Color, per page 5.00  
         4. 36"x36" Color, per page 7.50  
         5. 42"x42" Color, per page 10.25  
         6. Future Land Use Map, per page 3.25  
      c. Scanning:    
         1. 8.5"x11" (includes e-mail), per sheet 1.00  
         2. 24"x36" (includes e-mail), per sheet 2.00  
      d. Duplication - Electronic Records:    
         1. CD, per CD 1.25  
         2. DVD, per DVD 2.25  

       3. Flash Drive, per Flash Drive 5.00  
       
(C ) Building Permit Fees  
(1) New Construction - Residential and Commercial    
      a. New Construction - Structural - % of total construction value 0.77%  
      b. New Construction - Electrical - % of total construction value 0.34%  
      c. New Construction - Plumbing - % of total construction value 0.10%  
      d. New Construction - Mechanical - % of total construction value 0.12%  
(2) Construction including Residential and Commercial Alterations and Additions:    
      a. Structural - Percent of total construction value 1.91%  
      b. Electrical - Percent of total construction value 0.83%  
      c. Plumbing - Percent of total construction value 1.15%  
      d. Mechanical - Percent of total construction value 0.62%  
(3) Reinspection - All disciplines (each reinspection) 82.78  
(4) Lost plans review (replacement of on-site plans: sfr, multi, commercial, covers all disciplines) 96.57  
(5)  Plan resubmittal fee (for 3rd and subsequent resubmittals) 66.37  
(6) Open permit request - per request 48.28  
(7) Change in contractor and/or subcontractor - all disciplines 48.28  
(8) Contractor overtime request-plan review per hr, minimum 110.23  
(9) Expedited plan review, per hour, per trade (one hour minimum) 110.23  
(10) Administrative Fee for Engineering Permits 24.13  
(11) Early Start Approval 60.35  
(12) Private Provider Discount - Plan Review and Inspection 30%  
      a. Private Provider Discount - Inspection Only 15%  
(D) Structural Permit Fees    
(1) Administrative fees 106.23  
(2) Awning (each): Base fee 144.87
                           plus per awning 48.28  
(3) Deck (wood) 271.66  
(4) Demolition 150.90  
(5) Fence - base fee 106.23  
               plus, per lineal foot 0.34  
(6) Landscape affidavit 78.45  
(7) Garage door 169.02  
(8) Gutters 169.02  
(9) House moving filing fee within the City of Coral Springs 362.22  
(10) Hurricane Shutters ( sfr, duplex, triplex - each multifamily, commercial, per floor):    
      a.  1-3 shutters 144.87  
      b.  Each additional shutter 12.04  
(11) Masonry wall - base fee 169.02  
                           plus, per lineal foot 0.87  
(12) Minimum fee (one inspection) 106.23  
(13) Plan review (per 1/4 hour, minimum 1/2 hour) 30.17  
(14) Pool/spa/hot tub 241.47  
(15) Roofs/re-roofs:    
      a. Flat re-roof: 211.27
         1. First 50 squares 211.27  
         2. Each additional 50 squares 90.53  
      b. Re-roof slope 241.47  
      c. Roof repair (2 squares and under) 90.53  
      d. Roof slope and flat 452.77  
(16) Satellite dish ( over 18" requires separate electric permit) 144.87  
(17) Screen enclosure - pool 223.36  
(18) Signs (unlighted, permanent or temporary) 150.90  
(19) Slab ( porch, patio, monolithic)  144.87  
(20) Tent ( any size, each) 90.53  
(21) Trailer (construction, storage, each) 241.47  
(22) Window/door replacement 90.53  
  plus  $12.04 per unit 12.04  
(23) Kitchen Cabinet replacement only, no structural work required   0  
       
 (E ) Electrical Permit Fees  
(1) A/C change out 132.78  
(2) Meter can 90.53  
(3) Burglar alarm, new and retrofit (per floor up to 6 units) 55.00  
  with each additional unit at a cost of $8.55 each 8.55  
(4)  Commercial site lighting:    
      a.  1-3 light standards 90.53  
      b.  Each additional light standard 21.70  
(5) Computer systems (commercial, per floor) 169.02  
  Computer systems pre-wire (per floor) 90.53  
(6) Electric sign (each) 150.90  
(7) Electronic water meters, per unit 12.04  
(8) Energy management system 90.53  
(9) Fire alarm ( sfr, duplex, triplex - each multifamily, commercial, per floor) 211.27  
(10) Heat pump 138.84  
(11) Low voltage- individual systems per system (minimum fees):    
  a. 1. Sprinkler time clock, new installations only : 1-3 time clocks 106.23  
       2. each additional time clock 12.04  
(12) Minimum fee (one inspection) 106.23  
(13) Pool/spa/hot tub/fountain 241.47  
(14) Pool alarm system 138.84  
(15) Radon mitigation (per unit) 138.84  
(16) Satellite dish ( requires separate structural permit)  150.90  
(17)     a. Service Change:  Residential 120.73  
      b. Service Change:  Commercial 150.90  
(18) Sprinkler Pump, heat pump 144.87  
(19) Temporary electric 120.73  
    30-day temporary electric 60.35  
(20) Trailer (construction, sales, etc…) 150.90  
(21) Demolition 150.90  
(22) Plan review (per ¼ hour, minimum ½ hour) 30.17  
       
(F) Plumbing Permit Fees  
(1) Backflow preventer (new installation only), min. fee 120.73  
(2) Electronic water meters, per unit 12.04  
(3) Fire sprinkler system 301.83  
(4) Gas pool heater 90.53  
(5) LP Gas system ( 1 tank, 1 meter, 2 outlets)  90.53  
(6) LP Gas tank(s) 90.53  
(7) Minimum fee (one inspection) 102.61  
(8) Plan review (per 1/4 hour, minimum 1/2 hour) 30.17  
(9) Sewer hook-up 90.53  
(10) Site work, drainage, water mains, fire, sewer mains - % of contract price  2%  
(11) Solar pool heater/water heater 120.73  
(12) Water heater (domestic water) 90.53  
(13) Water well 2" - 4 1/2 " 90.53  
(14) Demolition 150.90  
(15) Irrigation System 181.10  
       
(G) Mechanical Permit Fees  
(1) A/C change out 132.78  
(2) Gas, pool heater 90.53  
(3) LP Gas system (1 tank, 1 meter, 2 outlets) 90.53  
(4) LP Gas tank(s) 90.53  
(5) Minimum permit (one inspection) 102.61  
(6) Plan review (per 1/4 hour, minimum 1/2 hour) 30.17  
(7) Radon mitigation  90.53  
(8) Demolition 150.90  
       
  Zoning:    
(1) Zoning Compliance Letter 174.13  
(2) Re-inspection:
 
      a.  Single-Family/Duplex 71.38  
      b.  Multi-Family 212.97  
      c.  Non-Residential 212.97  
(3) Sign review for installation or alteration 101.45  
(4) Expedited plan review, per hour (one hour minimum) 110.23  
  Fire:    
(6) Plan Review:    
      a. 2,500 sq. ft. and under 239.29  
      b. More than 2,500 sq. ft. Plus, per sq. ft. $.06 239.29  
      c. Single station smoke detector, per residential unit 73.90  
      d. Major plan revision, per hour 122.77  
      e. Minor plan revisions (correction, lost plans-Review not to exceed 15 minutes) 30.05  
      f. Expedited plan review, per hour ( one-hour minimum) 111.49  
(8) Re-inspection Fee 229.26  
  Engineering Administrative and User Fees:    
(1) Land clearing permit 239.29  
(2) Renewal of land clearing permit 71.38  
(3) Excavation permit 239.29  
(4) Renewal of excavation permit 71.38  
(5) Land filling permit 219.24  
(6) Renewal of land filling permit 71.38  
(7) Permit for installation and connection of sewers:    
      a. Residential 47.58  
      b. Commercial 77.65  
      c. Industrial 157.85  
(8) Improvements within public rights-of-way
 

    a. Per lance cut for pavement excavation 245.56  
      b. Per each 100 linear feet of off-pavement excavation 95.21  
      c. Driveway permit 157.85  
      d. Lost plans - Driveways only 95.21  
      e .All other improvements not specified above 98.96  
(9) Excavation in right-of-way    
  (other than driveway approach or apron), cash bond of 3029.67  
(10) Publicly dedicated easements:    
      a. Dedication 499.92  
      b. Vacation 499.92  
(11) Engineering fee for on-site water and sewer connections: 2% of construction costs (minimum of $473.59) 2%  
(12) Change of contractor 47.58  
(13) Overtime request - Inspections, per hour 219.24  
(14) Overtime request - Plan review, per hour 219.24  
(15) Expedited plan review, per hour (one hour minimum) 219.24  
(16) Lost plan reviews (replacement of on-site plans) 219.24  
(17) MS4/NPDES, per inspection (not to exceed $250.00) 67.63  
(18) Plan revision fee 219.24  
(19) Re-inspection fee 145.32  
(20) Work without a permit Double permit fee  
  Sec. 5-2. - Building Permit Submittal Fee Deposit  
  Deposit required with building permit application.
A deposit of one hundred dollars ($100.00) per single-family residential unit and two hundred dollars ($200.00) for all other building permits shall be required to be paid at the time application for building permits is made. Each deposit so made shall be nonrefundable with the monies being retained by the City of Coral Springs in the event a building permit is not issued to offset the administrative costs incurred in processing said application. If, however, a building permit is issued pursuant to said application then the monies so deposited shall be credited to the building permit cost at the time of issuance. Applications made for building permits shall be held by the city for a period of sixty (60) calendar days and if, at the expiration of this time period, a building permit has not been issued pursuant to said application then said application shall be voided by the city and the deposit monies credited to administrative expense.
  (Ord. No. 74-132, § 1, 6-18-74; Ord. No. 94-100, § 2, 2-15-94)
  Commercial Applications:
Tenant Improvements, Additions, Alterations Value over $25,000 - $200.00 Submittal Fee
  Residential Applications:
Alterations or Additions Value over 12,500 - $100.00 Submittal Fee